Key Points for Controlling the Installation Quality of Submersible Sewage Pumps
Key Points for Controlling the Installation Quality of Submersible Sewage Pumps
1. When the indoor floor of a building is lower than the outdoor ground, a sewage collection pit, Sewage Pump, or a prefabricated sewage lifting device should be installed. The domestic wastewater collection pit should meet the following requirements: the effective volume of the pit should not be less than the amount of water a single largest Sewage Pump can discharge in 5 minutes, and the pump should not start more than six times per hour. For prefabricated sewage lifting devices, the pump's start frequency should meet the product's technical requirements. Besides having the required effective volume, the collection pit should also comply with the setup and inspection requirements for pumps, water level controllers, and screens. The designed minimum water level of the collection pit should meet the pump's suction needs. The pit should have a maintenance cover, and the bottom should have a slope of not less than 0.05 directed toward the pump. The depth and floor area of the pit should be determined by the type of pump. Sewage collection pits should have bottom flushing pipes and water level indicators, and if necessary, an over-limit water level alarm that connects to the property management center.
2. In domestic wastewater collection pits, a backup pump should be installed. For sewage lifting devices, a single-pump or double-pump system should be chosen based on actual needs. For basement and garage floor washing drainage, if there are two or more pumps, a backup pump may not be necessary. For equipment room collection pits that receive equipment drainage, tank drainage, or accidental overflow, backup pumps should be installed in addition to working pumps based on the drainage volume. Sewage Pumps should have discharge pipes leading directly outdoors, and horizontal sections should incline toward the outlet. Each pump’s discharge pipe should have a valve and a sewage-specific check valve.
3. The maintenance opening of the collection pit should have a cover. If made of metal, it must be properly anti-corrosion treated and painted. Submersible Pump discharge pipes should be parallel to each other and perpendicular to the pit wall. Check valves, control valves, and pipe supports on the Pump discharge should be installed at the same height. Control valves should be easy to operate and at a certain distance from the control panel.
4. Metal pipes and structures installed in sewage pits should have enhanced protection and anti-corrosion treatment. Designers can also adopt other anti-corrosion measures based on the quality of the sewage or wastewater.
5. Pre-operation inspection: Fill the submersible Pump pit with water. When the water level rises above the Pump stop limit, manually start the Pump and check if the water level drops. If it doesn't, the Pump wiring sequence may be reversed; interchange the wires and restart the Pump. Run the Pump and check again.